Кафедра Транспортні вузли (КТВ ДІІТ)
Permanent URI for this communityhttp://crust.ust.edu.ua/handle/123456789/702
UKR: Раніше кафедра "Станції та вузли".
ENG: Department of Transport Hubs. Formerly known as the Department of Stations and Hubs.
ENG: Department of Transport Hubs. Formerly known as the Department of Stations and Hubs.
Browse
Now showing 1 - 2 of 2
- Results Per Page
- Sort Options
Item type:Item, Improvement of the Method of Time Rationing for Assembling Car Groups on One Track(Dnipro University of Technology, Dnipro, Ukraine, 2024) Kozachenko, Dmytro M.; Gera, Bogdan V.; Taran, Ihor; Korobiova, Ruslana H.; Malashkin, Vyacheslav V.; Hermaniuk, Yuliia M.ENG: Purpose. To improve the method for standardizing the duration of the shunting operation of assembling cars on one track. This can be achieved as a result of solving the following research problems: development of a method for searching the optimal order of assembling cars on one track; distribution parameters estimation of the random value of the duration of shunting operation of assembling cars on one track based on calculation experiments. Methodology. During the research, the methods of theory of railway operation, dynamic programming and mathematical statistics were used. Findings. Research on the assembling process of car group to one track established the distribution parameters of the random variable of time spent for shunting. In the course of the research, the problem of choosing the optimal order of shunting operations during car assembling was formalized and solved as a problem of dynamic programming. The time spent for shunting work was chosen as the optimality criterion. The paper considers the possibility of approximating the data of calculation experiments by analytical dependencies. It was found out that the use of linear polynomials with interaction allows obtaining dependencies describing time standards with a relative accuracy of ±5 %. Originality. The method is improved for developing the time standards for shunting work, which, unlike the existing one, is based on the performance of a series of calculation experiments, each of which solves the optimization problem of finding such an order of assembling cars that ensures minimum time consumption for shunting. Practical value. The methods developed in the work and the dependencies obtained allow improving the quality of decisions made when developing technology and designing railway stations and sidings of industrial enterprises.Item type:Item, An Optimization Method of the Multi-Group Train Formation at Flat Yards(Taylor & Francis Ltd., UK, 2021) Kozachenko, Dmytro M.; Bobrovsky, Volodymyr I.; Gera, Bogdan V.; Skovron, Ihor Ya.; Gorbova, Aleksandra V.ENG: Formation of multi-group trains is aimed at arranging their cars in a given order and is one of the mass operations performed at railway. In this regard, the reduction of the duration of shunting operations for the formation of multi-group trains is an urgent task for railway transport. In this paper, for a discrete deterministic-controlled system that simulates the operation of the flat yard, a mathematical statement of the problem of choosing the optimal order of multi-group train formation is obtained. The set of possible states of the system under study and the transitions between them are presented in the form of directed graph, which made it possible to reduce the problem of choosing the order of train formation to the problem of searching the shortest paths on the graph. An algorithm of searching the optimal order of train formation is proposed.